Target group Overview is split into 'Definition', 'Setup' and 'Progress' tabs.
Target group 'Definition'
'Definition' tab contains details about the country, regions, profiling, supply sources, quotas and excluded projects. Once your project is created you are no longer able to change specifications of any of the target groups. Please chat with us or email us at access@cint.com if you need assistance. Target group status is listed after its name.
Target group 'Setup'
'Setup' tab allows you to see current survey link template/remaining number of survey links and update it. If you ordered target group without survey links, here is where you would add the survey links.
You can switch between unique survey links and template link, at any time.
[Access Pro] here is where you'll find the link to the Ad Hoc Supplier Monitor, in target groups where you added Ad Hoc sample.
Target group 'Progress'
'Progress' tab helps you keep track of the target group's progress and price. Estimated and actual values for Incidence Rate and Length of Interview are shown here, if their changes causes a reprice they will be highlighted with green/red arrow
Respondents' statistics
- Responses - number of panelists that responded to the survey invitation
- Currently active - number of respondents currently taking the survey
- Latest complete - date and time of the latest respondent that completed the survey
- Completes - number of respondents that completed the survey, as registered by Cint
- Screenouts - number of respondents that did not fit the target group/quota into which they were invited
- Quota full - number of panelists that tried to answer the survey but the target group/quota already collected the wanted completed
- Timed out - number of respondents that started the survey but never finished it
Pricing of the target group
The initial, current and projected target group price is displayed (no.1, 2 and 3)
Note: Current and Projected price will be shown only after the target group has collected at least 15 completes.
TargetGroup Initial CPI (no.1 in the screenshot) = estimation of the CPI at the moment of ordering, assuming the TG will collected all completes and the Final IR/LOI won't changed by more than 25%. This is based on the pricing table for the country the TG is in. If you are using private pricing panels, then the CPI is based on the private pricing pricing table. For Access Pro, the Initial CPI is calculated as incentives+company complete fee when using own panels or only the company complete fee when using Ad Hoc supply.
TG Initial Price = based on the initial CPI and wanted number of completes of the target group
TG Current CPI (no.3) = when the price is based on a pricing table, if either IR or LOI have changed by more than 25% from the Estimated values, the system will take both Actual IR and Actual LOI to determine the new CPI. The Current CPI is based on volume discount given by the current amount of accumulated completes.
TG Current Price = based on the current CPI and current number of accumulated completes, what the TG would cost if you closed right now.
TG Projected CPI (no.2) = what the CPI is estimated to be at the end of the project. Based on Current CPI and wanted amount of completes, along with the projected volume discount.
TG Projected Price = based on the current CPI and the TG total wanted completes, what would the TG cost if allowed to continue with current CPI and collect all wanted completes.
Comments
0 comments
Please sign in to leave a comment.